Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the better-wp-security domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
November 18, 2015 – Bangalore Aviation

Daily Archives: November 18, 2015

DGCA report finds Air India operated 787 with only 4 of 47 screws installed

Air India Boeing 787-8 Dreamliner line number 35 test registered N1015 (later became VT-ANH) at the India Aviation show, Hyderabad March 2012. Photo copyright Devesh Agarwal.

On October 12, 2013, a little over two years ago, an Air India Boeing 787-8 Dreamliner registration VT-ANK performing flight AI803 from New Delhi to Bangalore with 147 passengers and seven crew, had its right hand side (RHS) heat exchanger access panel 196KR detach from the aircraft as it was landing at Kempegowda International Airport, Bengaluru around 09:40 (0410Z) 04:10 …

Read More »
+OK