Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the better-wp-security domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
April 23, 2013 – Bangalore Aviation

Daily Archives: April 23, 2013

Video: How Boeing responded to the Indian Navy’s P-8I additional flight and weapons’ testing needs

In 2012, the P-8I being built for the Indian Navy was transitioned in to flight testing by Boeing. With a committed delivery date set, the program was suddenly required to do additional flight testing, including weapons separation testing; and all this without adding any additional time to the schedule. Boeing was required to drop simulated weapons from the wing of …

Read More »
+OK