Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the better-wp-security domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
September 6, 2012 – Bangalore Aviation

Daily Archives: September 6, 2012

Air India takes delivery of its first Boeing 787 Dreamliner VT-ANH

VT-ANH under a Boeing test regn. N1015B at India Aviation 2012 After much delay, national carrier Air India has taken delivery of its very first Boeing 787 Dreamliner at the airframer’s facility in Charleston, South Carolina, USA. The aircraft LN 35, registered VT-ANH, was received by Captains A.S. Soman and Amitabh Singh on behalf of the airline. The aircraft is …

Read More »

IndiGo delay at Mumbai – a lesson in poor communications

Thanks to its strong, and consistent, on-time performance, Gurgaon based IndiGo, has grown to become the largest domestic airline in India, by passenger numbers. On Tuesday, 4th September, along with my better half, I experienced one of the rare delays that occur at the airline, and it was a doozy. A humble request to read the story till the end. …

Read More »

Photos: Bengaluru International Airport – Terminal 1 expansion in progress

Late last week, I traveled through Bengaluru International Airport (BIA) on my way to Mumbai traveling on Air India. While the trip report for that flight will be posted at a later date, I managed to snap a few pictures of the construction currently going on at the airport. Back in 2010, Bangalore International Airport Limited announced a Rs. 1000 …

Read More »
+OK